The hidden cost of contractor delays
Many contractor delays get blamed on the contractor. Almost always, that’s the wrong place to look.
This guide walks through the most common places contractor work actually grinds to a halt, from the moment they arrive to the moment the paperwork catches up, and what a genuine fix looks like for each one. Not a shortcut version of the current process, but a different way of designing it.
What's inside
- The predictable delays: induction queues, ID checks and permit sign-offs that all wait on one specific person being free.
- The trust problem nobody names: why contractors so rarely get to self-certify, and what changes when they can.
- The checklist mismatch: why a crane and a stepladder shouldn’t be inspected the same way, and what happens when they are.
- The paperwork catch-up: why the record of finished work often lags days behind the work itself.
What you'll take away
A map of where contractor work actually stalls, the eight most common points, mapped onto a contractor’s real journey onto site, so you can see exactly where your own process is losing time.
Real, evidenced fixes, not theory: each stall point paired with a practical fix.
The case for self-certification: why trusting contractors to the same standard as your own inspectors isn’t a risk, once the standard lives in the process rather than the person.
Where Assets+ fits in: Work Wallet’s newest capability, and the most direct answer to the hardest stall point of all.